|
|
|
Projects
|
|

 |
 |
Crestwood Corporate Centre
This building was designed and constructed to meet the performance criteria of the C-2000 Program, an initiative sponsored by Natural Resources Canada. This program addresses total building performance including; energy efficiency, environmental responsibility, user comfort, building longevity and adaptability. Features of the building include a grand 2 storey lobby, curved glazing units, and a 4 pipe mechanical system. The exterior skin consists mainly of metal panels and glass. A total of 240 outdoor parking stalls were provided for the building.
| Client: |
Bentall Development Co. Inc. |
| Consultant: |
Bunting Coady Architects |
| Area: |
80,000 ft2 |
|
|
©2006 Stuart Olson Inc.
All Rights Reserved
 |