Projects
|
|
Simplot French Fry Processing Facility
This project was carried out on an aggressive 11 month schedule. A precast concrete structure was used in the construction of the process area while conventional steel frame was used for the freezer utilities. A unique feature of the freezer is that it utilizes a direct loading approach from the freezer to either rail car or tractor trailer with no intermediate cooled clock space.
| Client: |
Simplot Canada Ltd. |
| Consultant: |
Earth Tech Canada Inc. |
| Area: |
200,000 ft2 |
|
 |

|
|
©2006 Stuart Olson Inc.