|
|
|
Projects
|
|
Suncor Firebag
The construction of the plant control building required a two-phase approach. The project scope included the construction of administration offices, a garage equipped with overhead doors, and a maintenance shop.
| Client: |
Suncor Energy Inc. |
| Consultant: |
Boucock Craig Wong Architects |
| Area: |
25,994 ft2 |
|
|
|
©2006 Stuart Olson Inc.
All Rights Reserved
 |